EN
Translate:
EN
Signed in as:
filler@godaddy.com
Now is the time to BUILD, not BUY.
An addition or extension in the Las Vegas Area is an opportunity for you to upgrade your home by adding square footage AND value at the same time.
At Tridel Construction, we listen carefully to your ideas and devise the perfect plan to bring those ideas to life.
We never cut corners and always apply best practices in designing additions so you can trust that you and your family will receive increased space and property value when your new addition is complete.
The most frequently asked question we receive at Tridel Construction revolves around costs pertaining specifically to additions. Because all projects are different it is difficult to answer these questions outside of a general cost window.
Popular room additions include:
-1st Floor Addition
-2nd Floor Addition
-Garage Addition
-Casita Addition
Each project has its own specific cost structure that varies when it comes to materials, professional services (electrical, plumbing, etc.), and labor. No matter the scope of the project, we are cost transparent and do our best to complete projects within budget.
Cost: $275 - $325/SQ FT
Planning Timeline: 1 - 3 Months.
This includes preliminary plans and construction document production.
Construction Timeline: 6 - 12 Months.
This varies largely based on the size of your project. Most of our additions are completed within 6 months, but inspection periods can delay progress. Allow 6 - 8 weeks for permitting on most major projects.
The most common addition is that of a master suite. This typically includes a master bedroom, 1 or 2 walk in closets, and a large master bathroom with a tub/shower combination. Building in an open, flat yard area where walls can be adjoined easily to existing walls is extremely cost effective.
Cost: $300 - $450/SQ FT
Planning Timeline: 1 - 3 Months.
This includes preliminary plans and construction document production.
Construction Timeline: 6 - 12 Months.
This varies largely based on the size of your project. Most of our additions are completed within 5 months, but inspection periods can delay progress. Allow 6 - 8 weeks for permitting on most major projects.
In the Las Vegas area, our developers like to build homes EXTREMELY close together! When we don't have room to expand out, we build up! Building a second story room addition involves serious labor, protective precautionary measures, and meticulous planning to ensure a properly secured extension to the existing structure.
Cost: $150 - $250/SQ FT
Planning Timeline: 1 - 2 Months.
This includes preliminary plans and construction document production.
Construction Timeline: 6 - 12 Months.
This varies largely based on the size of your project. Most of our garage additions are completed within 4 months, but inspection periods can delay progress. Allow 6 - 8 weeks for permitting on most major projects.
Garage additions can usually be completed without the amount of finish work required for interior living space. Typically the electrical work is minimal and there is little to no plumbing or wall finish required.
Cost: $275 - $350/SQ FT
Planning Timeline: 2 - 3 Months.
This includes preliminary plans and construction document production.
Construction Timeline: 8 - 12 Months.
This varies largely based on the size of your project. Most of our stand alone additions are completed within 4 months, but inspection periods can delay progress. Allow 6 - 8 weeks for permitting on most major projects.
In the Las Vegas area, building is proving to be more cost effective and beneficial than buying. It allows freedom for complete customization and time to ensure a solid structure that is up to code.
Copyright © 2008 TRIDEL CONSTRUCTION - All Rights Reserved
Powered by your Contractor